Solar basics 2 min read
How a Solar Plant Is Installed: From Site Survey to Switch-On
What exactly happens from first call to commissioning? We walk through each project stage, how long it takes and your role in it.

Clients ask: what happens after we sign, and when will I see the first saving on my bill? Here is the solar installation journey with GPS, step by step.
Key takeaways
- Six stages: survey, design, offer, supply and installation, connection and net metering, operation and maintenance.
- Homes take days; large factories take weeks.
- Your operations continue during the works.
- You receive a full file: drawings, warranties, O&M manual and monitoring.
Stage 1: free site survey
Our engineer measures space, checks roof condition, maps shading and reviews the electrical board and the last 12 months of bills. Book a free survey.
Stage 2: engineering design
- Panel layout on the roof.
- Inverter selection and string design.
- Monthly yield simulation.
- Structural study where needed.
Stage 3: technical and financial offer
A clear offer listing components, expected yield, savings, payback, timeline and warranties.
Stage 4: supply and installation
| Size | Approx. installation time |
|---|---|
| Home, 5–10 kW | 2–4 days |
| Business, 50–100 kW | 1–2 weeks |
| Factory, 500 kW–1 MW | 4–8 weeks |
Stage 5: testing, connection and net metering
- Insulation, voltage and current tests on every string.
- Earthing and protection checks.
- The net-metering application, distribution-company inspection and meter installation.
Stage 6: commissioning, handover and maintenance
We energise the plant, train your team on the monitoring platform, hand over the project and warranty file, then start scheduled maintenance.
An engineer visits to measure the space, review consumption and give a final quote.
How much would your plant save?
Get system size, cost and expected savings in under a minute.
Frequently asked questions
Do I need to be on site during installation?
Not constantly — a site contact for access is enough, and we send regular progress reports with photos.
When will I see savings on the bill?
Self-consumption savings show from the first bill after switch-on; the net-metering effect appears once the bi-directional meter is installed.
Keep reading
Solar basics Solar Energy in Egypt 2026: The Complete Guide from Idea to Switch-On
Everything you need to know before going solar in Egypt: how it works, what it costs, how much it saves, which system…
Solar basics How to Choose a Solar Company in Egypt: 10 Checks Before You Sign
Choosing the installer matters more than choosing the panel. Here are 10 practical checks that separate a professional solar company from the…
Solar basics How Many Solar Panels Do You Need? A Step-by-Step Calculation
Work out the number of panels and system size yourself from your electricity bill, with examples for a home, factory and farm,…
Solar basics How Much Space Does Solar Need on Roofs and Land?
How many square metres per kilowatt? A space guide for concrete roofs, metal roofs and ground mounts, and how shading and walkways…
Solar basics 12 Solar Energy Myths — and the Reality We See on Site
Do panels stop in winter? Do you always need batteries? Do they die after five years? We bust the most common solar…
Solar basics 15 Questions to Ask Before Installing Solar (Checklist)
A practical checklist that protects you from bad decisions: questions for yourself, for the installer, and about warranty and maintenance before signing.