How a Solar Plant Is Installed: From Site Survey to Switch-On

What exactly happens from first call to commissioning? We walk through each project stage, how long it takes and your role in it.

GPS Engineering Team
How a Solar Plant Is Installed: From Site Survey to Switch-On

Clients ask: what happens after we sign, and when will I see the first saving on my bill? Here is the solar installation journey with GPS, step by step.

Key takeaways

  • Six stages: survey, design, offer, supply and installation, connection and net metering, operation and maintenance.
  • Homes take days; large factories take weeks.
  • Your operations continue during the works.
  • You receive a full file: drawings, warranties, O&M manual and monitoring.

Stage 1: free site survey

Our engineer measures space, checks roof condition, maps shading and reviews the electrical board and the last 12 months of bills. Book a free survey.

Stage 2: engineering design

  • Panel layout on the roof.
  • Inverter selection and string design.
  • Monthly yield simulation.
  • Structural study where needed.

Stage 3: technical and financial offer

A clear offer listing components, expected yield, savings, payback, timeline and warranties.

Stage 4: supply and installation

Size Approx. installation time
Home, 5–10 kW 2–4 days
Business, 50–100 kW 1–2 weeks
Factory, 500 kW–1 MW 4–8 weeks
6clear project stages
0downtime for your operations on most projects
100%of strings tested before switch-on

Stage 5: testing, connection and net metering

  • Insulation, voltage and current tests on every string.
  • Earthing and protection checks.
  • The net-metering application, distribution-company inspection and meter installation.

Stage 6: commissioning, handover and maintenance

We energise the plant, train your team on the monitoring platform, hand over the project and warranty file, then start scheduled maintenance.

How much would your plant save?

Get system size, cost and expected savings in under a minute.

Open the calculator

#تركيب#مراحل#مشروع

GPS

GPS Engineering Team

GPS engineers have designed and built solar plants across Egypt for 15+ years. Here they share what they learn in the field.

Frequently asked questions

Do I need to be on site during installation?

Not constantly — a site contact for access is enough, and we send regular progress reports with photos.

When will I see savings on the bill?

Self-consumption savings show from the first bill after switch-on; the net-metering effect appears once the bi-directional meter is installed.