Skip to content
GPS – Green Power Solutions ع

Coral Sun Beach

Hurghada, Red Sea On-grid
Coral Sun Beach – solar power plant in Egypt by GPS
  • Installed capacity 394 kWp
  • Annual production 710 MWh/yr
  • Annual savings 1.37 M EGP/yr
  • Payback period 3.5 - 4.8 years
  • CO₂ reduction 426 t/yr
  • Equivalent trees 19,000
  • Diesel offset 177 K L/yr
  • Panel warranty 30 years

Overview

An on-grid solar plant for Coral Sun Beach hotel, Hurghada.

Aerial view

Coral Sun Beach – solar power plant in Egypt by GPS

Questions clients ask about projects like this

Straight answers before you start your own project.

How much can a solar plant save on a hotel's bill?

A plant typically covers 30%–70% of a hotel's consumption depending on available roof and carport space, and savings appear from the first bill after commissioning.

Does installation disrupt hotel operations or guests?

No. Work is phased on roofs and service areas on a schedule that respects guests, and power is only interrupted for minutes during the final tie-in.

Can the panels handle humidity and salt on the Red Sea and in South Sinai?

We use panels and structures certified for salt-mist resistance (IEC 61701) with stainless fixings, plus a cleaning and maintenance plan suited to coastal sites.

What is the payback period for a hotel plant?

Usually 3–5 years, while panels operate for more than 25 years, giving the hotel near-free electricity for many years after payback.