Hamytex For Textile

- Installed capacity 132 kWp
- Annual production 237 MWh/yr
- Annual savings 416 K EGP/yr
- Payback period 3.5 - 4.8 years
- CO₂ reduction 142 t/yr
- Equivalent trees 6,300
- Demand covered 100%
- Panel warranty 30 years
Overview
An on-grid plant for Hamytex textile factory, Sadat City.
Questions clients ask about projects like this
Straight answers before you start your own project.
Can the factory roof carry the panels?
We run a structural check before design. On metal roofs the system weighs about 12–15 kg/m², which suits most industrial roofs.
Can solar cover the whole factory consumption?
Up to 100% of daytime demand can be covered when space allows, and surplus exported to the grid is credited through net metering.
Does production stop during installation?
No. Roof works run in parallel with operations, and the final tie-in is scheduled by the plant management.
How do we monitor the plant's output?
We install remote monitoring that shows live output and savings on your phone, with instant alerts for any fault.